Central Avenue Bridge
City of Middletown - Insertion of twin 140 foot long, 14 foot diameter multiplate
pipes. Pipes were inserted under an existing monolithic bridge, backfilling
all voids. Replacement of underground utilities, new headwalls, sidewalks,
and pavement resurfacing.
Tylersville Road Improvements
ODOT Warren County - Improvement of 2.8 miles of two-lane road, widened to
a four-lane divided highway. Also included were 17,000 feet of storm sewer,
450 feet of box culvert, 50,800 square feet of sidewalk, 131,400 square
feet of bikeway, street lighting, and signalization of eight intersections.
Millikin Road Bridge
Butler County - 300 foot long, 40 foot high box-beam bridge on driven piling
with high performance concrete-poured deck.
Pleasant Run Creek Flood Control
City of Fairfield - 3,000 foot long, 8 to 16 foot high driven H-beam soldier
piling with pre-cast concrete panels.
Martin Marietta Gravel Plant
Martin Marietta Fairfield - Construction of gravel processing plant. Including
1/4 mile of conveyor system and 16 inch PE dredge pipeline.
Hunter Area Sanitary Sewer Project
Warren County Water and Sewer - Installation of approximately 15 miles of
sanitary sewer main ranging from 8 feet to 28 feet in depth. Mains are
both transmission and collectors, servicing a previously unsewered community.
Also included are three lift stations, 1,500 feet of 8 inch directional
boring, and full restoration of roads and private property.
Okeana Drewsburg Road Bridge
Butler County - 250 foot long, 25 foot high precast I-Beam bridge on driven
piling with high performance concrete, super-elevated radius deck. Project
also called for road re-alignment, 40 feet of 8x10 foot box culvert, and
25,000 cubic yards of embankment.
State Route 725 Improvements
ODOT, Montgomery County - 1.5 miles of road reconstruction and widening from
two to five lanes. Including the widening of an existing monolithic bridge.
Also included are 8,000 feet of water and storm sewer, 18,000 feet of curb
and gutter, 33,000 square feet of sidewalk, and 40,000 cubic yards of excavation